The bridge inspection on the Prussian Bridge will take place between 5 a.m. and 10 a.m., while the inspection of the Nahe Bridge in Michelswiese will take place between 10.30 a.m. and 4 p.m.. As the under-bridge inspection device takes up one lane, traffic will be diverted past the work site in one lane with traffic lights during both measures. At the Nahe bridge, the exit branch from the B41 into Michelswiese road will also be closed.
The city administration asks road users for their understanding for the disruption caused by the work.