On Sunday, November 24, 2024, a regular bridge inspection of the Wilhelm Leuschner Bridge in the Oberstein district will take place. This spans the B 41 - Nahe superstructure as Mainzer Straße just before the train station.
To carry out the work, the Nahe superstructure must be completely closed to traffic in this area from 9 am to 2.30 pm. The detour route is signposted. Traffic coming from Birkenfeld will be diverted from the B41 onto the L176 (Panzerstraße) at the intersection near the Enzweiler district and routed back onto the Nahe superstructure via Am Rilchenberg, Nordtorstraße and the Mainzer Straße connecting branch. At this point, traffic coming from Bad Kreuznach will be diverted via the Hauptstraße link road and routed back onto the B 41 via Emil-Kirschmann-Brücke, Mainzer Straße, Nordtorstraße, Am Rilchenberg and L176 at the intersection.